DC fast · Project supply
High-power charging for fleet depots, highway corridors and sites where vehicles pass through rather than park. Output, connector and site requirements are confirmed against the current lineup for your market.
01 / Where DC fits
DC is the right tool when the vehicle cannot stay. Three site types where that is the normal case.
Vehicles return on a schedule and leave on one. DC keeps the turnaround inside the shift, instead of stretching it across the night and eating the next day’s window.
Drivers are passing through and want to keep moving. The site has to be easy to reach, simple to start a session at, and reliable when several vehicles arrive together.
Charging becomes part of a short stop. Useful where stalls turn over quickly and an AC session would leave the car parked for hours after the driver is done.
02 / Current lineup
Output, connector and availability travel together, and they change by market. We share the current lineup and datasheets after a project review rather than publishing a table that may already be out of date.
| Model | Output | Connector | Certification | Availability |
|---|---|---|---|---|
| DC model A | To be supplied | To be supplied | To be supplied | To be supplied |
| DC model B | To be supplied | To be supplied | To be supplied | To be supplied |
| DC model C | To be supplied | To be supplied | To be supplied | To be supplied |
Model labels A, B and C are placeholders for this prototype. Real model names, ratings and marks are only stated in the issued datasheet for your market.
03 / Site requirements
A DC project starts at the service. Available capacity, the point of connection and the distance from it decide what the site can support before any charger is chosen.
A DC stall needs room to pull in, plug in and pull out again. Turning radius, cable reach, protection and winter storage belong in the layout, not in the addendum.
How a driver starts a session and how the site gets paid are two separate decisions, and neither is settled by the charger alone.
Uptime is a site plan, not a product feature. Someone has to own spares, monitoring and a local response before the first vehicle arrives.
04 / How a DC project runs
A DC project is four stages. Skipping the first one is how sites end up with hardware they cannot power.
Electrical service, layout and duty cycle. If the site cannot carry the load, that is a different project, and it is better to know before a configuration is discussed.
Output, connector, mounting and network options are matched to the site and the market. The configuration is fixed in writing before an order is placed.
Before shipment, the unit is checked against the agreed configuration and the release documents are confirmed. Acceptance criteria are agreed at configuration, not after delivery.
Installation by a licensed contractor, energisation, network handover and a live session. Sign-off follows the site checklist and the requirements of the local authority having jurisdiction.
05 / Next step
Send the address, the supply and the duty cycle. We will tell you what the site can support and which configurations are worth pricing.