Commercial AC · Project supply
Level 2 AC chargers, wall or pedestal, for multifamily, workplace and destination sites. Every installation is quoted per project, because stall count, electrical capacity and access rules change the answer.
01 / Where it fits
The hardware follows the stall layout and the operating model, not a fixed package. Start with the building.
Resident parking in garages, parkades and surface lots. Access, metering and how a resident settles a session are set by the property, so the configuration is agreed with the site team.
Staff and visitor charging where cars sit for most of the day. An AC session fits that pattern; the work is availability and fair access, not peak output.
Shared stalls and stays long enough to shop, eat or stay overnight. AC belongs where a car is parked for an hour or more, and DC belongs where it passes through.
02 / Configurations
Two starting points. Final configuration follows the stall count, cable reach and the electrical supply on site.

One stall per unit. The practical default for retrofit work, where a charger goes where the wall and the circuit already are, and the count grows stall by stall.

Two stalls from one cabinet, where vehicles sit side by side. Fewer wall positions and one service point per pair, subject to the electrical design and the layout.
Working name. “C-Series” is a placeholder used throughout this prototype. Final product nomenclature and model codes are still pending, so no name shown here should be quoted to a customer or written into a specification.
03 / What a project needs
Each step can change the previous one. That is why a project quote is a scope document, not a price list.
Panel and service capacity, spare circuits and load management. We work from single-line drawings or a site survey, and we do not size a project from stall count alone.
Wall or pedestal, single or dual port, cable reach and mounting positions. The layout decides the model; the model does not decide the layout.
Who may charge, how sessions are metered, and how the cost is recovered — resident, tenant, employee or customer. Network and payment scope is agreed with the property and its chosen provider.
Installation by a licensed electrical contractor, energisation, network connection and a first-session check. Inspection and certification requirements follow the local authority having jurisdiction.
04 / Documents for specifiers
Specifiers need documents at the design stage, not after an order. The current revision is confirmed when a project pack is issued.
| Document | What it covers | Status |
|---|---|---|
| Product datasheet | Electrical ratings, dimensions, mounting options | To be supplied |
| Certification scope | Marks and standards, by model and market | To be supplied |
| Installation guide | Site preparation, wiring and commissioning steps | To be supplied |
| OCPP / interoperability | Network and back-office compatibility statement | To be supplied |
The status column reflects this prototype, not a published certification. Document drafts and the current datasheet are shared during a project review.
05 / Next step
Building type, stall count, electrical supply and target date. That is enough for a first hardware shortlist and a scope conversation.