DC fast · Project supply

When dwell time is not an option.

High-power charging for fleet depots, highway corridors and sites where vehicles pass through rather than park. Output, connector and site requirements are confirmed against the current lineup for your market.

01 / Where DC fits

Short stays, tight schedules.

DC is the right tool when the vehicle cannot stay. Three site types where that is the normal case.

01

Fleet depots

Vehicles return on a schedule and leave on one. DC keeps the turnaround inside the shift, instead of stretching it across the night and eating the next day’s window.

02

Highway & corridor

Drivers are passing through and want to keep moving. The site has to be easy to reach, simple to start a session at, and reliable when several vehicles arrive together.

03

Retail, high turnover

Charging becomes part of a short stop. Useful where stalls turn over quickly and an AC session would leave the car parked for hours after the driver is done.

02 / Current lineup

The lineup, released on review.

Output, connector and availability travel together, and they change by market. We share the current lineup and datasheets after a project review rather than publishing a table that may already be out of date.

Model Output Connector Certification Availability
DC model A To be supplied To be supplied To be supplied To be supplied
DC model B To be supplied To be supplied To be supplied To be supplied
DC model C To be supplied To be supplied To be supplied To be supplied

Model labels A, B and C are placeholders for this prototype. Real model names, ratings and marks are only stated in the issued datasheet for your market.

03 / Site requirements

The site sets the scope.

Power supply

A DC project starts at the service. Available capacity, the point of connection and the distance from it decide what the site can support before any charger is chosen.

  • Service capacity and spare headroom
  • Transformer and switchgear condition
  • Utility coordination and timing

Space & access

A DC stall needs room to pull in, plug in and pull out again. Turning radius, cable reach, protection and winter storage belong in the layout, not in the addendum.

  • Stall dimensions and approach
  • Clearance from walls and columns
  • Snow storage and seasonal access

Network & payment

How a driver starts a session and how the site gets paid are two separate decisions, and neither is settled by the charger alone.

  • Authentication and roaming
  • Payment terminal or app
  • Back office and reporting

Service & uptime

Uptime is a site plan, not a product feature. Someone has to own spares, monitoring and a local response before the first vehicle arrives.

  • Remote monitoring and alerts
  • Spare parts and response time
  • Preventive maintenance schedule

04 / How a DC project runs

Site first. SKU later.

A DC project is four stages. Skipping the first one is how sites end up with hardware they cannot power.

01

Site review

Electrical service, layout and duty cycle. If the site cannot carry the load, that is a different project, and it is better to know before a configuration is discussed.

02

Configuration

Output, connector, mounting and network options are matched to the site and the market. The configuration is fixed in writing before an order is placed.

03

Site acceptance

Before shipment, the unit is checked against the agreed configuration and the release documents are confirmed. Acceptance criteria are agreed at configuration, not after delivery.

04

Commissioning

Installation by a licensed contractor, energisation, network handover and a live session. Sign-off follows the site checklist and the requirements of the local authority having jurisdiction.

05 / Next step

Start with the site, not the SKU.

Send the address, the supply and the duty cycle. We will tell you what the site can support and which configurations are worth pricing.