Installation · April 2026

Retrofitting charging into an existing condo garage

Most condo charging projects do not fail on the hardware. They fail because nobody established, before the purchase order, what the building’s electrical service could carry, who would pay for the electricity, and how a resident would get into a stall. This note walks through the sequence we use when a board asks about retrofitting an existing underground garage.

A retrofit is not a new-build with chargers added. The garage already has a service sized for lighting, ventilation, elevators and, in some buildings, block heaters. EV charging adds a large continuous load to a system that was never planned around it. The work is therefore mostly electrical and organisational, and only partly about which unit goes on the wall.

Retrofitting is an electrical project first

The useful question is not “how many chargers” but “how much spare capacity remains after existing demand”. A load calculation tells you whether the answer is a full build-out, a phased install, or a managed system that shares capacity across stalls.

That third option is common in older buildings: a management system shares a limited supply across several chargers, so the building can start without a service upgrade. What an upgrade would cost is To be supplied after an engineering review, because it depends on the utility connection and the age of the equipment.

Metering decides who pays, and who argues

The second decision is billing, and it belongs in the board minutes before anything is installed. Three models are common in Canadian multifamily buildings: the corporation absorbs the electricity as an amenity; each stall is metered and the resident pays for what they use; or a third-party billing layer handles sessions and reimbursement.

Each has consequences. An amenity model is simplest for residents but exposes the corporation to consumption it cannot control. Per-stall metering is fairer but needs accurate hardware and a payment process. Adding a billing layer after the fact costs more than choosing one at design time. The multifamily solutions page sets out how these models combine.

Access and rules are part of the product

A charger in a shared garage needs an answer to “who can plug in”. The options run from open access to a fob or app-restricted group to time-limited sessions that discourage all-day parking. None of these is a hardware afterthought: access rules decide whether the site needs networked units, a simple local control, or neither.

Signage matters as much as firmware. Stall marking, a posted tariff, and a number to call when a unit is offline prevent most of the complaints that otherwise reach the property manager. Resident onboarding is one short item at the first board meeting plus a one-page guide in the garage. Buildings that skip it field support calls in the first month, mostly about access rather than charging.

Physical placement and cable routes

Underground garages are constrained in ways a floor plan rarely shows. Clear height, column spacing, existing conduit, fire separations and the location of the electrical room all shape the design. A stall that looks easy on a drawing may need a core drill through a slab, or a new run along a ceiling that already carries sprinkler and ventilation services.

Walking the garage with an electrician before pricing beats discovering the route mid-install. Where a resident owns the stall, the route may cross common property — a permission question as well as a construction one. Commercial AC equipment is designed for this environment; the commercial AC range describes the mounting and supply options we support in shared garages.

A phased plan beats one large commitment

Boards rarely want to commit the whole garage at once. A workable sequence is: review the service and the route, install a pilot group in the most requested area, measure utilisation for a season, then extend. This produces real demand data before the next special assessment and tests the billing model on a small group.

Phasing also protects the budget. If the pilot shows light use, the building may never need the full build-out it was quoted. If utilisation is high, the second phase has evidence behind it.

The garage decides the scope. Settle the load calculation and the metering model first, and the hardware conversation becomes much shorter.

Start with the building

A condo retrofit is decided by service capacity, metering model and access — not by the charger. Start with the multifamily overview, then bring us the garage layout.

This note is editorial. Load calculations, permits and billing arrangements are confirmed per building and per jurisdiction.

Related notes

More from the floor.

Commercial garage charging installation
InstallationFebruary 2026 · 4 min read

Service capacity, breaker space, cable route and permits — the inputs that decide whether a quote is real.

Novus Volt Standard 40A home charger
HomeFebruary 2026 · 4 min read

Panel capacity, overnight windows and battery size decide this more often than brochure output.

DC fast chargers in a commercial lot at dusk
MarketJanuary 2026 · 5 min read

Duty cycle, dwell time and site power decide whether DC fast is the right tool or an expensive answer to the wrong question.

Next step

Planning a garage retrofit?

Send the garage layout, the panel photo and the charging model the board has in mind. We will confirm what can be scoped now and what needs an engineering step.