Solutions · Multifamily & condo
Shared garage charging fails on policy more often than on hardware. We scope access, fair cost allocation and phased capacity around the building you already have.
01 / The three decisions
Hardware is the last question, not the first. These three answers determine what gets bought and how it is wired.
Residents, staff, visitors or all three. Access control follows the answer. A garage open to the public needs a different setup from a residents-only one.
The building, the resident, or a split. Metering and billing have to make that answer visible on a statement, not just in a policy document.
Start with the stalls that will actually be used, then add capacity as demand appears. Phased build-out avoids paying for idle hardware.
02 / A typical stack
Every layer has to agree with the others. The status column shows what this prototype can confirm today.
| Layer | What it covers | Confirmed scope |
|---|---|---|
| Hardware | Commercial AC, wall or pedestal, shared or reserved stalls. | Shortlisted per site |
| Access control | Who can start a session, and how they identify at the stall. | To be supplied |
| Metering & billing | How resident use is measured and recovered from the right payer. | To be supplied |
| Network & software | Session data, monitoring and the interface the operator uses. | To be supplied |
| Installation & commissioning | Conduit, panel work, permits, inspection and handover. | Quoted per project |
Access, metering and software rows depend on the hardware package and the operating model selected. They are confirmed per project, not assumed from this page.
03 / Retrofit reality
That is normal. Most garages predate home charging as a line item, and the constraints show up in the same order every time.
Count the stalls, measure clearances and find where conduit can actually run. Note who parks where overnight, because utilisation follows parking habits, not stall numbers.
Existing service, spare breakers and panel locations. A service upgrade may be avoidable with load management. Only a licensed electrician or engineer can confirm that for your building.
Eligibility, cost recovery and what happens when a resident moves out. Write it down before installation, or the first billing cycle becomes the policy by default.
Pilot a row, watch demand, then extend. Phasing keeps spending tied to use and limits how much of the garage is closed at once.
04 / What we need from you
Site checklist
Stall count and layout. How many stalls, and whether they are shared or assigned.
Building type and occupancy. Low-rise, high-rise, condo or rental, and how many residents park overnight.
Existing panel information. Service size, spare capacity and photos of the panel if you have them.
Utility and metering arrangement. Who is billed today, and whether a separate meter is feasible.
Target timing. When the board or owner wants to decide, and whether a pilot phase is acceptable.
A layout drawing or a photo of the panel is enough to start. If the electrical information is incomplete, the first deliverable is a list of what your contractor needs to confirm.
Send documents through the project enquiry form. Please do not post panel photos or building plans publicly.
05 / Multifamily questions
06 / Next step
A layout drawing, a panel photo and a stall count is enough to start the conversation. We will tell you what the building supports before anyone buys hardware.