Solutions · Multifamily & condo

Resident charging, without the tenant fight.

Shared garage charging fails on policy more often than on hardware. We scope access, fair cost allocation and phased capacity around the building you already have.

01 / The three decisions

Three decisions before a single stall.

Hardware is the last question, not the first. These three answers determine what gets bought and how it is wired.

01

Who can charge

Residents, staff, visitors or all three. Access control follows the answer. A garage open to the public needs a different setup from a residents-only one.

02

Who pays

The building, the resident, or a split. Metering and billing have to make that answer visible on a statement, not just in a policy document.

03

How it grows

Start with the stalls that will actually be used, then add capacity as demand appears. Phased build-out avoids paying for idle hardware.

02 / A typical stack

Five layers, one system.

Every layer has to agree with the others. The status column shows what this prototype can confirm today.

Layer What it covers Confirmed scope
Hardware Commercial AC, wall or pedestal, shared or reserved stalls. Shortlisted per site
Access control Who can start a session, and how they identify at the stall. To be supplied
Metering & billing How resident use is measured and recovered from the right payer. To be supplied
Network & software Session data, monitoring and the interface the operator uses. To be supplied
Installation & commissioning Conduit, panel work, permits, inspection and handover. Quoted per project

Access, metering and software rows depend on the hardware package and the operating model selected. They are confirmed per project, not assumed from this page.

03 / Retrofit reality

The building was not designed for this.

That is normal. Most garages predate home charging as a line item, and the constraints show up in the same order every time.

01

Parking audit

Count the stalls, measure clearances and find where conduit can actually run. Note who parks where overnight, because utilisation follows parking habits, not stall numbers.

02

Electrical capacity

Existing service, spare breakers and panel locations. A service upgrade may be avoidable with load management. Only a licensed electrician or engineer can confirm that for your building.

03

Resident policy

Eligibility, cost recovery and what happens when a resident moves out. Write it down before installation, or the first billing cycle becomes the policy by default.

04

Phased install

Pilot a row, watch demand, then extend. Phasing keeps spending tied to use and limits how much of the garage is closed at once.

04 / What we need from you

Send us these first.

Site checklist

Stall count and layout. How many stalls, and whether they are shared or assigned.

Building type and occupancy. Low-rise, high-rise, condo or rental, and how many residents park overnight.

Existing panel information. Service size, spare capacity and photos of the panel if you have them.

Utility and metering arrangement. Who is billed today, and whether a separate meter is feasible.

Target timing. When the board or owner wants to decide, and whether a pilot phase is acceptable.

We will tell you what is missing.

A layout drawing or a photo of the panel is enough to start. If the electrical information is incomplete, the first deliverable is a list of what your contractor needs to confirm.

Send documents through the project enquiry form. Please do not post panel photos or building plans publicly.

05 / Multifamily questions

The questions boards ask.

How do we split the cost between residents?
There is no standard split. Some buildings recover cost per session, some charge a flat monthly fee, and some treat charging as an amenity. The metering and billing arrangement has to match the policy the board chooses. We scope the options; the building decides.
What about renters versus owners?
Access can be granted to whoever the building authorises, but move-outs, deposits and cost recovery need a rule. Landlord and tenant requirements differ by province and by building, so confirm the policy with your legal counsel before installation.
Do we need load management?
Only the electrical review can answer that. It depends on service capacity, panel locations and how many cars charge at the same time. Load management can reduce peak demand, but it is not a substitute for an inadequate service.
We already have chargers. Can you work with them?
Possibly. Mixed hardware makes access and billing harder, because two systems rarely share one policy. We start with an audit of what is installed and what it reports, then decide whether to extend it or replace it.
How disruptive is the installation?
Conduit runs, panel work and parking closures are the visible parts. A phased rollout can keep most of the garage open. The contractor sets the sequence with building management, and access notices go out before work starts.

06 / Next step

Send us the garage plan.

A layout drawing, a panel photo and a stall count is enough to start the conversation. We will tell you what the building supports before anyone buys hardware.