Commercial AC · Project supply

Charging for shared parking.

Level 2 AC chargers, wall or pedestal, for multifamily, workplace and destination sites. Every installation is quoted per project, because stall count, electrical capacity and access rules change the answer.

01 / Where it fits

Three sites, one family.

The hardware follows the stall layout and the operating model, not a fixed package. Start with the building.

01

Multifamily & condo

Resident parking in garages, parkades and surface lots. Access, metering and how a resident settles a session are set by the property, so the configuration is agreed with the site team.

02

Workplace

Staff and visitor charging where cars sit for most of the day. An AC session fits that pattern; the work is availability and fair access, not peak output.

03

Retail & destination

Shared stalls and stays long enough to shop, eat or stay overnight. AC belongs where a car is parked for an hour or more, and DC belongs where it passes through.

02 / Configurations

Single port or dual port.

Two starting points. Final configuration follows the stall count, cable reach and the electrical supply on site.

Commercial AC charger on a garage wall beside a parked car
Working nameSingle portAC

C-Series · Single port

One stall per unit. The practical default for retrofit work, where a charger goes where the wall and the circuit already are, and the count grows stall by stall.

Deployment
Wall or pedestal
Access
RFID / app Scope to be confirmed
Certification
To be supplied
Underground condo parking with chargers serving neighbouring stalls
Working nameDual portAC

C-Series · Dual port

Two stalls from one cabinet, where vehicles sit side by side. Fewer wall positions and one service point per pair, subject to the electrical design and the layout.

Deployment
Wall or pedestal
Access
RFID / app Scope to be confirmed
Certification
To be supplied

Working name. “C-Series” is a placeholder used throughout this prototype. Final product nomenclature and model codes are still pending, so no name shown here should be quoted to a customer or written into a specification.

03 / What a project needs

Four decisions before hardware.

Each step can change the previous one. That is why a project quote is a scope document, not a price list.

01

Electrical capacity audit

Panel and service capacity, spare circuits and load management. We work from single-line drawings or a site survey, and we do not size a project from stall count alone.

02

Hardware match

Wall or pedestal, single or dual port, cable reach and mounting positions. The layout decides the model; the model does not decide the layout.

03

Access & billing

Who may charge, how sessions are metered, and how the cost is recovered — resident, tenant, employee or customer. Network and payment scope is agreed with the property and its chosen provider.

04

Commissioning

Installation by a licensed electrical contractor, energisation, network connection and a first-session check. Inspection and certification requirements follow the local authority having jurisdiction.

04 / Documents for specifiers

The pack, before the quote.

Specifiers need documents at the design stage, not after an order. The current revision is confirmed when a project pack is issued.

Document What it covers Status
Product datasheet Electrical ratings, dimensions, mounting options To be supplied
Certification scope Marks and standards, by model and market To be supplied
Installation guide Site preparation, wiring and commissioning steps To be supplied
OCPP / interoperability Network and back-office compatibility statement To be supplied

The status column reflects this prototype, not a published certification. Document drafts and the current datasheet are shared during a project review.

05 / Next step

Send us the site.

Building type, stall count, electrical supply and target date. That is enough for a first hardware shortlist and a scope conversation.