Commercial AC · Project supply
Charging for shared parking.
Level 2 AC chargers, wall or pedestal, for multifamily, workplace and destination sites. Every installation is quoted per project, because stall count, electrical capacity and access rules change the answer.
01 / Where it fits
Three sites, one family.
The hardware follows the stall layout and the operating model, not a fixed package. Start with the building.
Multifamily & condo
Resident parking in garages, parkades and surface lots. Access, metering and how a resident settles a session are set by the property, so the configuration is agreed with the site team.
Workplace
Staff and visitor charging where cars sit for most of the day. An AC session fits that pattern; the work is availability and fair access, not peak output.
Retail & destination
Shared stalls and stays long enough to shop, eat or stay overnight. AC belongs where a car is parked for an hour or more, and DC belongs where it passes through.
02 / Configurations
Single port or dual port.
Two starting points. Final configuration follows the stall count, cable reach and the electrical supply on site.

C-Series · Single port
One stall per unit. The practical default for retrofit work, where a charger goes where the wall and the circuit already are, and the count grows stall by stall.
- Deployment
- Wall or pedestal
- Access
- RFID / app Scope to be confirmed
- Certification
- To be supplied

C-Series · Dual port
Two stalls from one cabinet, where vehicles sit side by side. Fewer wall positions and one service point per pair, subject to the electrical design and the layout.
- Deployment
- Wall or pedestal
- Access
- RFID / app Scope to be confirmed
- Certification
- To be supplied
Working name. “C-Series” is a placeholder used throughout this prototype. Final product nomenclature and model codes are still pending, so no name shown here should be quoted to a customer or written into a specification.
03 / What a project needs
Four decisions before hardware.
Each step can change the previous one. That is why a project quote is a scope document, not a price list.
Electrical capacity audit
Panel and service capacity, spare circuits and load management. We work from single-line drawings or a site survey, and we do not size a project from stall count alone.
Hardware match
Wall or pedestal, single or dual port, cable reach and mounting positions. The layout decides the model; the model does not decide the layout.
Access & billing
Who may charge, how sessions are metered, and how the cost is recovered — resident, tenant, employee or customer. Network and payment scope is agreed with the property and its chosen provider.
Commissioning
Installation by a licensed electrical contractor, energisation, network connection and a first-session check. Inspection and certification requirements follow the local authority having jurisdiction.
04 / Documents for specifiers
The pack, before the quote.
Specifiers need documents at the design stage, not after an order. The current revision is confirmed when a project pack is issued.
| Document | What it covers | Status |
|---|---|---|
| Product datasheet | Electrical ratings, dimensions, mounting options | To be supplied |
| Certification scope | Marks and standards, by model and market | To be supplied |
| Installation guide | Site preparation, wiring and commissioning steps | To be supplied |
| OCPP / interoperability | Network and back-office compatibility statement | To be supplied |
The status column reflects this prototype, not a published certification. Document drafts and the current datasheet are shared during a project review.
05 / Next step
Send us the site.
Building type, stall count, electrical supply and target date. That is enough for a first hardware shortlist and a scope conversation.
Canadian EV charging for homes, buildings and fleets — certified hardware, documented quality, and support that stays local.
Contact[email protected]
© 2026 Novus Volt Inc. · Toronto, Ontario