Installation · February 2026
A quote is a number. A site review is the reasoning behind it. Four inputs — service capacity, breaker space, cable route and permits — move the price far more than the choice of charger, which is why the review comes first.
Most installation surprises are not caused by the charger. They come from something nobody checked: a full panel, a route that needs a trench, or a permit that holds up the work. A review finds those things while they are cheap to plan around.
The review starts at the panel or the service entrance, not at the parking spot. An electrician records the service rating, the main breaker, the measured or calculated existing load and the spare capacity, then confirms whether another continuous load can be added.
On a single-family home the question is whether one more circuit fits. On a commercial or multifamily site it is a load calculation across the building, which may involve an engineer. Without that number, any quote is an estimate with a margin attached — and the margin is usually generous.
Space is physical as well as electrical. A panel can have spare amperage and no free positions, or free positions and a busbar that cannot accept another double-pole breaker. Age matters too: some older panels are difficult to extend safely or are already due for replacement.
The review notes the panel type, the available positions, the condition of the enclosure and whether a subpanel is the cleaner route. Any recommendation to replace equipment is documented with a reason. Replacing a panel is a real cost, and it should never appear in a quote as a default line item.
The route is the largest variable in most residential installations. Distance from the panel to the stall, whether the run is interior or exterior, whether it crosses a finished ceiling, a driveway, a deck or a garden, and whether conduit is required all change the labour and the material.
A reviewer walks and photographs the route, including every turn, wall penetration and crossing. The same charger can be a straightforward job in one house and a trench plus a core drill in the next. That difference lives in the route, not the product.
Most municipalities require an electrical permit for a new charger circuit, and an inspection follows the work. Some also apply zoning or parking rules that affect where a post can stand. On larger sites the utility may need to review the added demand before the connection is energised.
The review identifies which approvals apply so they can be sequenced with the installation rather than discovered afterwards. Local timelines vary considerably, and the permit timeline for your municipality is To be supplied at the review stage. What a review itself costs is also To be supplied and depends on the site.
A written scope that fits on one or two pages: the proposed circuit, the route, the equipment, the permits, the assumptions and the exclusions. It is short, but it is specific enough that two installers pricing the same scope should land in a similar range.
If two quotes differ sharply, the scopes differ: one may exclude permits, another may assume an easier route, a third may not have checked the panel. Comparing scopes is more useful than comparing totals, and the review makes that possible.
A review is not an upsell. It is the cheapest part of the project and the step that most often prevents a surprise: a service upgrade nobody budgeted for, a route that needs a trench, or a permit that stalls the job after the charger has arrived.
Novus Volt offers professional installation as an option on the retail models; you can also use your own electrician with the review as the brief. Start from the home AC range and request the visit through the installation quote form.
A site review does not make a project more expensive. It makes the price honest.
A quote without a site review is a range, not a number. Send the address, a panel photo and the stall location to start the process.
This note is editorial. Service capacity, permits and inspection requirements are confirmed per site and per jurisdiction.
Related notes

Load calculations, metering strategy and resident access decide scope long before a charger is specified.

The panel and the overnight window decide the amperage long before the brochure does.

Warranty claims, firmware questions and installer callbacks: who answers, and what happens next.
Next step
Send the address, a clear photo of the open panel and where you want the charger. We will confirm the next step and what the review needs to cover.